Skip to main content
webosan/Sourcing tool

Sourcing tool

Injection pen RFQ template and due diligence checklist

Twenty questions that decide whether two injection pen quotes are actually comparable. Send them to us or to any other manufacturer - the list is written to be reused, not to favour one answer.

20 questions in four groups. Copy the whole list, or copy one group.

01

Device and dose definition

Get these five answers before any price discussion. If a supplier cannot state them as numbers, the rest of the quotation is decoration.

1.1Which platform are you quoting, and what is its stroke length in mL?

Stroke in mL is the only figure that can be compared across suppliers. "60 units" means nothing without the concentration.

1.2What is the minimum deliverable dose and the dose increment, both in mL?

The increment decides whether your titration steps are physically possible on this pen.

1.3Which cartridge format does it accept - 1.5 mL or 3 mL, and is it ISO 11608-3 compliant?

Cartridge format fixes the entire mechanical envelope. Changing it later is a new tool, not a revision.

1.4What injection force is required at end of stroke, and how is it measured?

Excess force is the most common reason a pen fails human-factors testing in the hands of the actual patient group.

1.5Which needle gauges and lengths are validated with this pen?

The pen is validated with the needle it was tested with. A different gauge voids the dose-accuracy data.

02

Who actually makes it

A trading company and a factory answer these differently, and the difference shows up two years later as a supply interruption.

2.1Do you own the plant that will mould and assemble this pen? Give the site address and the company name on the business licence.

An address and a licensed name can be checked. An assurance cannot.

2.2Will any step be subcontracted - moulding, assembly, sterilisation, printing or packaging?

"We can do it" and "we do it here" are different claims, and only the second one survives an audit.

2.3Who owns the tooling developed for our program, and under what conditions can it be transferred?

Tooling ownership is what makes a supplier replaceable. Without it you are not sourcing, you are locked in.

2.4Who will be named as manufacturer of record in our regulatory submission?

A submission names a legal manufacturer that must be able to hold the technical file. Decide this before tooling, not after.

2.5Can we visit the line that would run our order, before we place it?

An hour on the floor answers questions a questionnaire cannot answer in a month.

03

Quality system and documents

Ask for identifiers, not adjectives. Every item here is checkable by a third party.

3.1Which quality system certificate do you hold, issued by which body, valid until when?

A certificate number can be looked up in a public database. A logo on a website cannot.

3.2What documentation accompanies each batch release?

Certificate of analysis, batch record extract and retention samples - agree the list once, then expect it on every shipment.

3.3What is your change control process, and how are we notified before a material or process change?

Unannounced changes are the most common way an already-filed device quietly stops conforming.

3.4Which third-party tests have been run on this platform, and can we see the reports?

Dose accuracy and injection force should arrive as ISO 11608 reports, not as a sentence in a brochure.

3.5How many deviations and CAPAs were opened on this platform in the last 24 months?

A supplier reporting zero deviations is either flawless or not recording them. The number itself is less telling than the willingness to give it.

04

Commercial terms

These cannot be answered from a catalogue. Any supplier who publishes firm numbers for all five has either not read your program or is quoting someone else's.

4.1What is the minimum order quantity for our annual volume, and does it change with packaging scope?

MOQ is a function of platform, cavity count, packaging and scheduling, so it has to be quoted against your inputs.

4.2What is the lead time for first article, for first production batch, and at steady state?

Three different clocks. A supplier who gives one number is hiding two of them.

4.3What is included in the unit price, and what is invoiced separately?

Tooling, printing plates, validation batches and freight are where two quotes for the same pen diverge.

4.4What is the payment schedule, and is it tied to milestones?

Milestone payment is standard in device programs. A demand for full prepayment before tooling is a risk signal.

4.5What happens at end of life - last-time buy, tooling handover, document archive?

Exit terms matter more than entry terms. Nobody negotiates them at the point where they are needed.

Copy and send

Both blocks below are plain text. Paste the first into an email body, keep the second as your own scoring sheet.

RFQ email

Subject: Injection pen RFQ - device definition and due diligence

Hello,
We are evaluating injection pen suppliers. Please answer the questions below in writing, and state clearly where an answer depends on our inputs rather than giving a generic figure.

Our program: <product / dose volume> | annual volume <n> | packaging <pen | pen + needle | printed kit> | market <country> | target launch <date>

1. DEVICE AND DOSE DEFINITION
   1.1 Which platform are you quoting, and what is its stroke length in mL?
   1.2 What is the minimum deliverable dose and the dose increment, both in mL?
   1.3 Which cartridge format does it accept - 1.5 mL or 3 mL, and is it ISO 11608-3 compliant?
   1.4 What injection force is required at end of stroke, and how is it measured?
   1.5 Which needle gauges and lengths are validated with this pen?

2. WHO ACTUALLY MAKES IT
   2.1 Do you own the plant that will mould and assemble this pen? Give the site address and the company name on the business licence.
   2.2 Will any step be subcontracted - moulding, assembly, sterilisation, printing or packaging?
   2.3 Who owns the tooling developed for our program, and under what conditions can it be transferred?
   2.4 Who will be named as manufacturer of record in our regulatory submission?
   2.5 Can we visit the line that would run our order, before we place it?

3. QUALITY SYSTEM AND DOCUMENTS
   3.1 Which quality system certificate do you hold, issued by which body, valid until when?
   3.2 What documentation accompanies each batch release?
   3.3 What is your change control process, and how are we notified before a material or process change?
   3.4 Which third-party tests have been run on this platform, and can we see the reports?
   3.5 How many deviations and CAPAs were opened on this platform in the last 24 months?

4. COMMERCIAL TERMS
   4.1 What is the minimum order quantity for our annual volume, and does it change with packaging scope?
   4.2 What is the lead time for first article, for first production batch, and at steady state?
   4.3 What is included in the unit price, and what is invoiced separately?
   4.4 What is the payment schedule, and is it tied to milestones?
   4.5 What happens at end of life - last-time buy, tooling handover, document archive?

Scoring sheet

For each answer, mark it as a number, a claim or a refusal. Only numbers are comparable, and a refusal is data too.

Question | Answer given | Number / Claim / Refusal

-- Device and dose definition
1.1 Which platform are you quoting, and what is its stroke length in mL? |  | 
1.2 What is the minimum deliverable dose and the dose increment, both in mL? |  | 
1.3 Which cartridge format does it accept - 1.5 mL or 3 mL, and is it ISO 11608-3 compliant? |  | 
1.4 What injection force is required at end of stroke, and how is it measured? |  | 
1.5 Which needle gauges and lengths are validated with this pen? |  | 

-- Who actually makes it
2.1 Do you own the plant that will mould and assemble this pen? Give the site address and the company name on the business licence. |  | 
2.2 Will any step be subcontracted - moulding, assembly, sterilisation, printing or packaging? |  | 
2.3 Who owns the tooling developed for our program, and under what conditions can it be transferred? |  | 
2.4 Who will be named as manufacturer of record in our regulatory submission? |  | 
2.5 Can we visit the line that would run our order, before we place it? |  | 

-- Quality system and documents
3.1 Which quality system certificate do you hold, issued by which body, valid until when? |  | 
3.2 What documentation accompanies each batch release? |  | 
3.3 What is your change control process, and how are we notified before a material or process change? |  | 
3.4 Which third-party tests have been run on this platform, and can we see the reports? |  | 
3.5 How many deviations and CAPAs were opened on this platform in the last 24 months? |  | 

-- Commercial terms
4.1 What is the minimum order quantity for our annual volume, and does it change with packaging scope? |  | 
4.2 What is the lead time for first article, for first production batch, and at steady state? |  | 
4.3 What is included in the unit price, and what is invoiced separately? |  | 
4.4 What is the payment schedule, and is it tied to milestones? |  | 
4.5 What happens at end of life - last-time buy, tooling handover, document archive? |  |

Why this page has no MOQ and no lead time on it

Because neither is a property of a catalogue. Minimum order quantity depends on which platform, how many cavities the tool has, whether printed packaging is in scope, and how your run schedules against the others already booked. Lead time depends on whether tooling already exists, component purchasing lead times, and whether you require a first-article approval step before the first production batch.

A single figure published here would be wrong for most buyers, and a buyer who budgets against a wrong figure is lost at the second purchase order. So we quote against your inputs. A firm MOQ printed on every product page is a number that fits none of them.

What we need in order to quote properly

  • Annual volume, and whether it is expected to grow
  • Target dose volume or platform, plus cartridge format
  • Packaging scope: pen only, pen with needle, or printed kit
  • Target market and launch date, since the regulatory route changes the sequence

Questions this page answers directly

What is the minimum order quantity for an injection pen?
It is quoted per program rather than published, because it depends on the platform, the cavity count of the tool, the packaging scope and how the run schedules against existing orders. Send annual volume and packaging scope and the number you receive applies to your order rather than to an average.
How long does an injection pen order take?
There are three clocks: first article, first production batch, and steady-state repeat orders. With existing tooling the first article is the shortest of the three; a new tool adds mould manufacture and at least one tool-correction cycle. We quote all three instead of one averaged figure.
Can I send this checklist to other suppliers as well?
Yes, and it is written to be reused against any injection pen manufacturer. We would rather be compared on the same twenty questions than win on a vaguer one.

Sourcing tool

Send the completed list and get a real quotation

Fill in what you know and leave the rest blank. We will answer every question in writing, including the ones where the answer is "depends on your tooling".

Continue on WhatsApp

Send the checklist with your market and annual volume - we answer in writing, point by point.